Customization: | Available |
---|---|
Production Scores: | Multiple Varieties |
Production Continuity: | Continuous |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Mixing machine | 8.Hot pressing | 15.Cap welding | 22.Sealing nail welding |
2.Coating machine | 9.X-ray test | 16.1st Leakage inspection | 23.Final leaking inspection |
3.Calendering | 10.Pairing | 17.Vacuum Baking | 24.RT standby |
4.Preslitting | 11.US welding | 18.1st EL.injection | 25.Capacity test |
5.Tab Forming | 12.Connector | 19.High temperature standing | 26.OCV and IR test |
6.Winding | 13.Mylar Wrapping | 20.Fortation | 27. Wrapping |
7.Tunnel Furnace | 14.Insertion into Housing and Spot welding | 21.2nd EL.Injection |