Customization: | Available |
---|---|
Production Scores: | Multiple Varieties |
Production Continuity: | Continuous |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Whole Line Process
No. | Technical Specification | Technical Parameter | Remark |
1
|
Overall line dimensions (Length mm* width mm* height mm) |
134500*6400*3000 | For reference size, see factory layout |
2
|
Appearance color of the whole line | Custom | Perform according to customer requirements |
3
|
Applicable to cell type Thickness * Width * Height (mm) |
50.1*160*118.5 | Thickness 39 ~ 73mm; Width 145 ~ 180mm; Height 98 ~ 210mm |
4
|
Primary optimum rate | ≥99.8% | The first optimum rate of the aluminum bar welding process of the module |
5
|
Equipment noise | ≤75db | 1m away from the device shell |
6
|
Cell sorting | Internal resistance range 300mΩ | ±0.5%rdg.±5dgt. The maximum display is 310.00 mΩ |
7 | Voltage range 20V | ±0.01%rdg.±3dgt. Maximum display ±19.9999V |
|
8
|
Production efficiency of the whole line | 24PPM(prototype cell) | Device side efficiency |
9
|
Equipment transfer rate | ≥98% | Final subject to customer site |
10
|
Product qualification rate | ≥99.8% | Non-equipment exceptions are not counted |
11
|
Power requirements | 220V,50~60Hz/380V,50~60Hz | The total power of the entire line will be provided after the 3D parties confirm it |
12
|
Air source requirement | Compressed air pressure 0.5~0.7MPa | Compressed air φ12; Nitrogen φ12; |
No. | Item. | Technical Parameter |
1 | Whole line efficiency Equipment noise |
≥24PPM |
≥16PPM | ||
3 | yield | ≤75dB |
4 | Utilization rate | Primary pass rate≥99.8% |
5 | DT Rate/ failure rate | ≥98% |
6 | CMK | ≤2% |
7 | Change requirement | CMK ≥1.67 |
8 | Whole line efficiency | One key change |
NO. | Equipment Name | Quantity | Units | Remark |
1 | Cell feeding | 1 | PCS | |
2 | Cell scan code | 1 | PCS | |
3 | OCV/ACR test | 1 | PCS | Includes NG elimination, feed |
4 | Cell gluing | 1 | PCS | Reserve automatic gluing position |
5 | Gluing test | 1 | PCS | Reserved station |
6 | Module stack | 1 | PCS | Includes end plate & insulation sheet line |
7 | Manual module strapping | ≥2 | PCS | Compatible side panel mounting |
8 | Polarity address&Laser engraving |
1 | PCS | |
9 | Safety test | 1 | PCS | |
10 | pole laser welding | 1 | PCS | |
11 | CCS installation(Manual) | 1 | PCS | |
12 | Laser welding | 1 | PCS | |
13 | After welding clean | 1 | PCS | |
14 | After welding test | 1 | PCS | |
15 | Placement of acquisition board |
1 | PCS | Reserved station |
16 | Nickel plate welding | 1 | PCS | Reserved station |
17 | NTC glue | 1 | PCS | Reserved station |
18 | Module EOL test | 1 | PCS | |
19 | The module is affixed with heating sheet |
1 | PCS | |
20 | Automatic offline | 1 | PCS | Compatible mode combination and union |
21 | Box line | 1 | PCS | |
22 | Box cleaning & inspection | 1 | PCS | |
23 | Housing component installation |
1 | PCS | |
24 | Battery box bar code paste | 1 | PCS | |
25 | Module into the box | 2 | PCS | |
26 | Module fixation | 2 | PCS | |
27 | Harness connection | 2 | PCS | Includes 1 line side station |
28 | Wiring harness alignment | 2 | PCS | Includes 1 line side station |
29 | Battery box EOL test | 2 | PCS | |
30 | Battery box DCR test | 1 | PCS | |
31 | Gasket & top cover mounting | 2 | PCS | |
32 | Case airtight test | 4 | PCS | |
33 | Pack down | 1 | PCS | |
34 | Battery box packing | 1 | PCS | |
35 | High pressure box production line |
2 | PCS | |
36 | Module &PACK rework area | 1 | PCS | |
37 | Production line logistics system | 1 | PCS | AGV+ Material Terminal station |
Q1 :How to ensure the quality of your products?
A:We have a professional design and quality team, we have focused on the module PACK line for 9 years. The core members of the industry are from the battery industry.
Q2: What is your delivery time?
A : 30-60Days
Q3 :What if our team knows very little about the PACK line??
A : We will provide you with turnkey service and free training of your employees, and provide 1 year of paternity after delivery of the production line.
Q4:How to deal with the problem of equipment parts?
A : We will prepare a spare part for you before shipment, so that you can react quickly when the equipment needs to be replaced without affecting production.