New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine

Product Details
Customization: Available
After-sales Service: Provided
Warranty: 1year
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Full Customization
The supplier provides full customization services
3D Software Design
The supplier provides 3D software design services
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (23)
  • New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
  • New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
  • New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
  • New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
  • New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
  • New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
Find Similar Products
  • Overview
  • Product Parameters
  • Company Profile
  • Our Advantages
  • After Sales Service
  • FAQ
Overview

Basic Info.

Model NO.
Bluesea
Technical Class
Laser Welding
Control
Automatic
Power Density
6kw
Laser Classification
Ruike
Type
Automatic Laser Welding Machine
Colour
Custom
Dimension
2600L*1600W*3000h
Efficiency
800-1200ppm (Tbd)
First-Time Yield
99.5%
Transport Package
Container
Specification
Custom size
Trademark
Bluesea
Origin
China
Production Capacity
200/Month

Product Description

Product Parameters
No. Technical Specification Technical Parameter Remark
1
Dimension(Lmm*Wmm*Hmm) 2600*1600*3000 Reference size
2
Colour Custom Customer provides logo pattern
3
Scope of application(mm)
 
Wire welding, nickel welding, pole welding, stud welding, bus welding, explosion-proof valve welding, shell sealing welding, liquid injection port welding  
4 First-time yield ≥99.5% The first optimum rate of the aluminum bar welding process of the module
5
Efficiency 800-1200ppm (to be confirmed) Wire welding, nickel welding, pole welding, stud welding, bus welding, explosion-proof valve welding, shell seal welding, liquid injection mouth welding, single welding time, excluding manual operation time
6
Equipment grafting rate The production shutdown time caused by equipment abnormality shall not exceed 25 minutes under 8H working system; No more than 30 minutes on 11H duty Final subject to customer site
7
Product qualification rate ≥99.8% Non-equipment exceptions are not counted
8
Power requirements 220V,50~60Hz/380V,50~60Hz, bus power 140Kw Party A shall provide the main power supply to the main power cabinet of the production line
9
Air supply requirements Compressed air pressure 0.5~0.7MPa, air consumption 1.2m³/min; Nitrogen gas consumption: 20L/min Party A shall provide 3-5 air source points beside the line body
10
Plant and environmental requirements Greater than or equal to class C plant; Relative humidity requirements 40%-60%; Temperature 18-30° The improper environment of the plant may lead to the accumulation of static electricity and damage of components

Machine Layout

New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine

Machine Action Flow:
Action process: After the product enters the welding machine positioning, the manual start of the welding machine, the distance sensor is used for distance measurement, and the three-axis laser is driven to weld the busbar, so that the cell pole and the busbar are fused together. The smoke and dust generated by welding are removed in time. After the welding is completed, the fixture product is manually removed.
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
Company Profile
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
Shenzhen Bluesea Intelligent Manufacturing Technology Co., LTD., founded in 2016, is an overall intelligent manufacturing solution supplier focusing on the research and development, manufacturing, lean process consulting and factory MES construction of lithium battery module PACK automation production line equipment .The industry involves new energy vehicle power batteries, portable energy storage, home energy storage batteries, Industrial and commercial energy storage batteries, two-wheeled vehicle batteries, electric tool batteries, special batteries and other fields.With years of consulting, information and intelligent equipment service experience in the lithium industry, we help enterprises build one-stop intelligent manufacturing solutions for lithium batteries.
 
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine
Our Advantages

New Energy Lithium Ion Prismatic Battery Pack Laser Welding MachineNew Energy Lithium Ion Prismatic Battery Pack Laser Welding MachineNew Energy Lithium Ion Prismatic Battery Pack Laser Welding MachineNew Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine

After Sales Service

New Energy Lithium Ion Prismatic Battery Pack Laser Welding Machine

FAQ

1.Who are we?
Bluesea Company was founded in 2016, only focus on providing PACK production line, core members are from battery head enterprises to escort your production line.We have two factories in Shenzhen and Ninghai, Shenzhen factory has 10,000 square meters of R & D center, Ninghai factory has 30,000 square meters of demonstration workshop.

2.why choose your company?
We have more than 100 production line orders from domestic head customers, such as EVE, Huawei, GAC, Midea and other well-known domestic brands, and also sell to many production lines in Turkey, Iran, the United States, Azerbaijan, Portugal, Russia and other countries.

3.What are the advantages of your production line?
1. Fast delivery time: The production line has been standardized, and we have broken through the fastest production line delivery time of 30 days.
2. One key quick change: The whole production line does not require complex processes to achieve product change with one key.
3. High quality: or more than 100 customers praise.


4.What service you can provide?
1.turnkey project.
2.Free training.
3.accompany to production in your factory.
4.factory planning.
5.After-sales service 1Year.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier